Sector
Commercial
Client: BAM Construction Ltd
Hall & Kay are proud to provide fire protection systems for another high-quality building as part of the Kings Cross regeneration.
Location
London
Standard
BSEN 12845 inc. LPC Rules
Installation requirements
- Sprinkler heads: 3,500
- Tank: Existing site infrastructure
- Valve set: 3 with duplicates
Programme
1 year
Year of completion
2023
We are proud to be part of this high-profile and challenging project, delivering sprinklers, pre-action, gas suppression and dry risers within Building S3.
All systems were fully modelled to BIM LOD 200. The dry riser system was designed to comply with the requirements of BS9990, the sprinkler system was designed to BSEN 12845 standards certified to LPS 1048 and the gas suppression systems to BSEN 15004 with LPS 1204.
All sprinkler pipework on the office floors has been powder coated – RAL 9010 (colour & Sheen percentage) to suit the aesthetic of the space.