Sector
Data Centre
Client: Crown House Technologies
Delivering a full fit-out for this brand-new data on behalf of a leading colocation data centre provider, as part of broader development.
Location
Manchester
Standard
FM global data sheets 2-0 & 2-32
Installation requirements
- Sprinkler heads: 1,826
- Fire pumps:: 1x electric
- Tank: 46.3m3
- Valve set: 15
Programme
1 year
Year of completion
2022
The system comprised 13x pre-action valves and 2x wet control valves, nitrogen generators, a single electric pump rated to deliver 400 USGPM @ 4 bar and 3x 46.3m3 water storage tanks to protect data halls, general circulation areas, battery and plant areas, office and storage areas.
The systems were designed to comply with FM global sheets 2-0 and 5-32 with a range of risks protected including HC1 4MM/MIN, HC2 8MM/MIN and HC3 12mm/min.