Installation requirements

  • Fully integrated security system with CCTV, Access Control, Intercoms & speed lanes

Year of completion

2021

Our install team delivered a fully integrated security system with lift destination calling at Bloom Clerkenwell on behalf of HB Reavis in January 2020.

The initial brief included full system design and installation of CCTV, Access Control, Intercoms and speed lanes. The installation played a significant part in the building securing BREEAM’s outstanding status and ‘Secured by Design’ security standard. The project was also successfully completed in August 2021 and rolled out within 3 months prior to practical completion. Due to the project’s success of the project, we were asked to provide ongoing support to the building and acquired a 3-year maintenance contract.

The project’s most significant challenges came from the client’s desire to display lift information within the speed lane gates, integrate the new QR readers with their existing Visitor Management System (VMS) and provide a cost saving to the end-user. We were able to utilise a specific CCTV platform to provide a more cost-effective solution for the client; however, the CCTV and Access Control manufacturer required additional resources to configure the necessary integrations.

To successfully integrate the panel supplied by the lift manufacturer into the speed lanes, we created a custom script via the high-level lift integration to
trigger outputs from the Access Control to the three sets of speed lane inputs. Taking this action resulted in the speed lanes clearly indicating which lift had been called on entry to the speed lanes. This allowed us to fully integrate the existing Visitor Management System into the Access Control so that visitors with valid QR codes could be granted entry and full audit tracking with other buildings.

Pictures courtesy of Peter Cook.

Related commercial case studies…

Kings Cross S3

Kings Cross S3

Hall & Kay are proud to provide fire protection systems for another high-quality building as part of the Kings Cross regeneration. Read more

London Borough of Redbridge

London Borough of Redbridge

Protecting one of London’s greenest boroughs. Read more

The O2 Arena

The O2 Arena

We currently provide maintenance on behalf of Ansco Arena, for all fire protection systems within the arena and a number of individual ... Read more

The Hackney Empire

The Hackney Empire

We were tasked with fully upgrading the site's Access Control System from the existing legacy Sateon system via Site Guard to the ... Read more

Need to talk to someone?

To speak to one of our team, call us on 0121 4321 3311 or email enquiries@hkfire.co.uk